Local Petroleum Prices
Premium (GHp/Lit): 116.9800
Kerosene (GHp/Lit): 91.0000
Gas Oil (GHp/Lit): 118.0500
MGO Local (GHp/Lit): 97.7400
Premix (GHp/Lit): 54.2700
LPG (GHp/Kg): 83.8100
World Petroleum Prices
Brent Crude ($/BBL): View
Light Sweet ($/BBL): View
Brent Crude ($/BBL): View
Akosombo Dam Water Level
Maximum level (ft): 278.00
Minimum level (ft): 240.00
Current level (ft): 255.00
Opinion Polls
1. Energy Consumption Calculator.
2. Power Factor Improvement.
3. Energy-Wise.
4. CPL Information.
5. Energy Saving.
6. Tips on buying electrical appliances.
Latest Oil Headlines
Electric Power Headlines
Natural Gas Headlines
Latest Coal Headlines
Latest Nuclear Headlines
Latest Metals Headlines
NEWS
Floating Production Storage Offloading, (FPSO) Kwame Nkrumah
Posted on July 10th, 2010     View Comments
The much anticipated Floating Production Storage Offloading, (FPSO) Kwame Nkrumah, a key facility in the entire crude oil production, arrived at the Jubilee Field in Takoradi in the Western Region Monday morning.
The vessel would be used to collect and process crude oil in commercial quantity from the Jubilee field when actual production begins later this year. It was named after Ghana’s founding President Kwame Nkrumah at a ceremony in Singapore by the First Lady, Ernestina Naadu Mills. After its commission, the vessel set off on May 21 from the Jurong Shipyard in Singapore where it was built.
Gayheart Edem Mensah of Tullow Oil’s communications directorate described the spectacle of the vessel the size of about three football fields put together, as awesome.
“The FPSO is an awesome facility, awesome in terms of its size, awesome in terms of various models that you have on the FPSO, it also has the capacity to generate energy for its work,” he explained to Joy News’ Bernard Saibu.
He said the arrival of the vessel to be stationed at the Jubilee Field is an indication that “the Jubilee partners are on course to produce oil by Quarter four of this year.”
Construction of the FPSO began in 2008 and involved the conversion of an existing tanker by MODEC, a leading international company in the FPSO industry. The vessel is estimated to cost 875 million dollars. It is measuring 330 metres long and 65 metres wide, and can process 120,000 barrels of oil a day with a storage capacity of 1.6 million barrels.
It has 17 modules weighing more than 12,500 tons installed on the vessel, including a water treatment plant, crude separation plant, chemical injection plant, gas processing and injection plant, the turret, electricity generation plant, as well as a 120-room accommodation among others.
blog comments powered by Disqus
 
Home | About Us | News | Tenders/Bids | Public Notices | Links | Contact Us | FAQs
Copyright © 2009. All rights reserved.
Ministry of Energy, Government of Ghana, P. O. Box T40, Stadium Post Office, Accra-Ghana
Tel: 233-21-667152-3, 683961-4 Fax: 233-21-668262
Email: moen@energymin.gov.gh